Ferrocement Photo Gallery

Ferrocement Photos

Click to view full size image

Photo 05

I this view of the mockup you can see the base plate at the bottom of the pipe that I eventually sunk into concrete with a lot of steel rod and angle chunks welded to it for mechanical adhesion. I don't know who's drink that was or what it was. The step treads are adjusted with 7-1/2" risers and a gentle slope to shed water. The top step will be exactly 7-1/2" below the finished landing-to-be at the site.

ted3.jpg ted4.jpg ted5.jpg ted6.jpg ted7.jpg
Rate this file (No vote yet)